# Canton Railway British Section Estimate
Main Head VIII. b. Station Machinery
Work: Taipo Station
Quantity DESCRIPTION Unit Rate $ AMOUNT $ CES 1 Water tanks and water supply for Engines 2,500 00 1 Pumps 600 00 84 Scotch Blocks Each 30 2,520 00 2 Buffer Stops 100 00 1 Loading Gauge 60 00 Signals 200 00 Total 4,910 00 Contingencies 10% 491 00 Grand Total 5,401 00--;
SI
.eawlisar notneD noolwo
MOIT932 HEITINA
STAMITZA
#1
A
J
17:
COLINIAIPAC
DO
t
09
.R.E. No. 2.4.
Canton Railway.
Tkowloon Canton
132
BRITISH SECTION
ESTIMATE.
bost n
bach i
Main Head
Sub. Head
VIII.
b. Station Machinery.
Work
Taipo Station.
Quantity
DESCRIPTION.
Water tanks and water supply for Engines
Pumps.
with coluNZI 84
Scotch Blooks.
2 Buffer Stops
Loading Guage
Si-nals
istoT
Total
2201 zsinigniinoë
Rate.
Unit.
$
AMOUNT.
CES.
2,5
500
600
30- Bach
100
60
200
150
1,4
400
00
00
00
00
00
8 8 8 8 8 8
00
4,910 00
491
00
Contingincies 10%
✓5,401 00
}x}#{ the
Grand Total